Scroll Top

Hybridised Plantroom Installation

Project: Hybridised plantroom installation
Client: Associated British Ports
Location: Suffolk
Date: December 2022

Project Description:

When decarbonisation is being considered by a client, we are experienced in providing calculated and robust engineering solutions.

We are proud to have served the UK’s leading ports group for the past decade and were appointed to replace the non-condensing natural gas-fired boilers with a new system.

This system was required to provide the seamless integration of renewable technologies and high-efficiency condensing boilers.

The incorporated renewable technologies were robustly tested, with our team ensuring the gas-fired plant could run on natural gas (G20) and hydrogen blended gases (G222).

This solution provided a new benchmark of performance for the client, ensured efficiency and came in under budget.