Scroll Top

Commercial Kitchen

Project: Commercial Kitchen 
Client: Public Sector
Location: Norwich
Date: Spring 2025

Project Description:

This commercial kitchen plantroom in Norwich was in need of a complete upgrade, and our Mechanical and Electrical teams were on hand to design and deliver the solution. 

We installed AIC Coilmaster boilers alongside a Silox tank-in-tank cylinder, providing the client with a reliable and energy-efficient system.

By utilising the cascading modules, we replaced the failed BMS with an AIC controls package, enabling precise management of variable and constant temperature heating circuits, as well as a primary hot water system (HWS) all managed from the lead boiler.

Protecting the heating system was a plate heat exchanger, two chemical dosing sets, and an air/dirt separator to ensure the highest levels of efficiency are maintainable throughout the new systems life. For scale mitigation, we installed two Stuart Turner catalytic water conditioners on the MCWS supply and HWS return, delivering a robust and long-term solution.

Once commissioned, gas consumption was measured at 50% lower than the previous plantrooms usage, with an increase of 34% in efficiency of gas consumed, and a reduction 42% of NOx emissions. These outstanding results not only help our client meet energy efficiency targets but also ensure a practical and effective heating and hot water supply.

Here at Industrial Boiler Services (UK) Ltd we provide a comprehensive range of services encompassing hire boiler solutions, installation, operational support, maintenance and servicing. You can read more about these services here.

commercial project kitchen