Project: Industrial Gas Network Decommissioning
Client: CBRE
Location: Gosport
Date: Spring 2026
Project Description:
When a global facilities management provider needed to decommission the industrial gas supply at a client’s manufacturing facility, they turned to us at Industrial Boiler Services (UK) Ltd for a safe and reliable solution.
Located in the South of England, this former television manufacturing site presented several significant challenges, including asbestos-containing materials, working at height, and a leaking gas installation. Through detailed site surveys, comprehensive risk assessments, and meticulous planning in collaboration with the client, our team ensured that every aspect of the project was fully understood before work commenced.
The industrial gas supply was successfully purged, disconnected, and capped without incident, with all works completed safely, efficiently, and in full compliance with relevant regulations.
This project perfectly demonstrates our ability to manage and deliver complex, high-risk activities while maintaining the highest standards of safety, quality, and professionalism. Delivered on time and on budget, it is another example of our teams at Industrial Boiler Services (UK) Ltd providing practical solutions to challenging engineering problems.
Another safe site. Another satisfied client.

