Project: Reactive Repair and Maintenance Schedule Client: HMP Channings Wood Location: South Devon Date: Summer 2024
Project Description:
Following the failure of a laundry’s steam production plant, our team were on hand to assist the Southwest site with a detailed repair schedule.
The works included the replacement of a Clayton steam generator coil, including a full lift plan due to the size, and the servicing of all steam traps on the wider system.
Full commissioning to OEM standards was undertaken, as well as load monitoring, advice on future operations, and an updated review of contingency plans to cover future events.